A word on the numbers below. These are the ranges we use across Sydney jobs, not North Ryde specific figures, and we’d rather say that than pretend we’ve built a statistical model of one suburb.
- Kitchen renovation: $25,000 to $60,000 and up
- Bathroom renovation: $18,000 to $40,000 and up
- Full home renovation: $100,000 to $400,000 and up
- Ground floor extension: $150,000 to $350,000 and up
- Second storey addition: $250,000 to $500,000 and up
Where North Ryde jobs differ is the older stock. Anything built before the late 1980s can bring asbestos testing and removal into the budget, along with rewiring and replumbing that nobody planned for. Blocks that fall away toward the Lane Cove River side can add drainage and engineering on top.
The number that moves most is structural. Taking out a load bearing wall means an engineer, a beam and usually a pier or two, and it can add $8,000 to $15,000 before you’ve chosen a single tile. Find that out at the quote, not in week three.
